Stairwell Partition Built
The frame around the new stair well has been erected in readiness to receive the glass panels. It is a very simple construction of a header rail screwed up into the ceiling, a base rail on the floor and vertical 'T' section studs between them :
The door is slightly offset so that it lines up with the staircase, hence there is a fixed sidelight to the left hand side :
In fact, with this stud centered on the newel, a 9 stud partition did not give sufficient landing between the riser of the last step and the door, to meet building regs (400mm). An extra stud would be needed. I opted instead for the positioning on the edge of the newel, so that the building regs for the landing were satisfied by a 9 stud partition. I marked the position of each stud with a strip of red sticky tape on the floor.
These lower studs, down to the string, are also designed to be infilled with glass and my calculations allow the 'T' edge of the stud to overhang the edge of the newel, thus giving a straight edge for the glass across the junction between them.
When I returned home from work, the framework had been built, but I could see that the studs had not been aligned to my red sticky tape markers and that the whole wall was about 10cm shorter than I had expected. The reason is the alignment of that first stud on the newel post. It has been shifted such that the outer edge aligns with the newel edge :
When questioned, the joiner just thought I had got my calculations wrong. He now understands what I was getting at. He doesn't think it will be a problem, and the overall shorter partition still gives us the 400mm landing, so all should be well in the long run.