After 4 days work, with material coming in each day, and the digger and dumper on-site, the job is nearly complete.  The bottom of the pit has been flattened and a layer of topsoil applied, the bank similarly :


 These photos don't really show off what it is like, but you get the basic idea.

The patio area is roughly levelled, and the track down from the road is being left for now so that we have easy access for materials.
They will return to scrape that over once the patio is done