Stonework Finished
A couple of other things to report from today. The last of the stone mullions has now been installed, in the rear dormer window :
Also today, I ordered the staircase (the straight one to upstairs, not the spiral). Having taken my order over the phone, they are going to post me a detailed order form, and a drawing for signature and confirmation of sizes. They are then going to build the staircase (apart from the winder steps and balustrade) in the factory and deliver it to us on the back of a lorry.


0 Comments:
Post a Comment
<< Home